            STANDARE CONTRACT

            APPENDIX-C

            SCHENGULE OF QUANTITIES, PRICING AND PAYMNET CONDRRIONS

            1.0 WORK TO BE PERFORMED

            Except as specified elwhere in the Contract, except for the Employer supplied

            material and equipment as detailed in the Scope of Work, Contractor shall supply

            all the materials, labor, technical support, supervision, tools, equipment and plant,

            transportation, consumable and perform all the works required for completion of

            decoration work of Continent supermarket Fuangzhuang Fengtai district, Beijing

            for employer. The construction area of the work is M more or less.

            2

            2.0 LUMP SUM PRICE

            The Total Lump Sum Price for performing all work is temporarily

            RMB 3,000,000.00Yuan, Say: RMB three million YUAN only (It is depend on

            the actual work performed by the contractor under the mutual agreement)

            Price Notes

            The lump Sum Price includes, but not limited to, the cost of works, taxes

            and charges, overhead and profit and all the expens which could be

            required by Contractor for the completion of the Works under the Contract.

            Unless there will be change in the Scope of Wok shown by the current

            drawings, no variation daim will be entertained.

            3.0 UNIT PRICES FOR CHANGES

            Unit prices for changes shall be full and complete compensation for additional

            work or credit for deleted work. Prices include but not limited to, labor, material,

            rvices, overhead and profit. The Unit Prices shown in the bid package

            submitted earlier will be ud as a reference basis in evaluating future variations.

            Tho items of variation which do not have reference basis shall be priced in

            accordance with quota.

            4.0 ADJUSTMENTS

            All prices are fixed for the duration of the Contract and are not subject to

            escalation for any cau. Payment of the Total Contract Price shall constitute full

            payment for performance of the Work and covers all costs of whatever nature

            incurred by Contractor in accomplishing the Work in accordance with the

            provisions of the Contract.

            5.0 REOUIRED SUBMITTALS

            The following submittals are a prerequisite to the initial payment after the award

            of contract;

            5.1 Contract Schedule

            5.2 Execution Plan

            6.0 TERMS AND CONDITIONS OF PAYMENT

            6.1 The total sum value is temporarily RMB3,000,000.00.(Say: three million

            RMB yuan only), Contract singed after and satisfying the conditions of

            down payment; Pay 30% of contract sum (RMB9000,000.00Yuan, Say:

            nine hundred thousand RMB Yuan for preparation fee);

            6.2 40% finished :Pay 30% of contract sum (RMB600,000.00 Yuan, Say: nine

            hundred thousand RMB Yuan);

            6.3 80% finished: Pay 20% of contract sum ( RMB6000,000.00 Yuan, Say: six

            hundred thousand RMBYuan);

            6.4 after final checking by employer, government,. The actual construction cost

            will be checked and confirmed by party A, party B, and supervisory

            company. The rest 15% to be paid after final checking. The principle as

            following;

            6.4.1 According to Beijing 96 Budget Price Book.

            6.4.2 Becau it is night work, so the civil engineering labor fee is

            RMB40.00/day, the installation labor fee is RMB30.00/day. And the night

            work cut down efficiency fee can not be charged.

            6.5 Maintenance fee 5%of contract sum will be paid after one year of

            maintenance. For the progress payment, the Contractor shall submit to

            Employer his written request supported by a statement of accomplishment

            for review, then the Site Manager assigned by the Employer shall review

            the payment request. The Site Manager shall endor payment request after

            review to Employer for relea of payment. The whole process from the

            submission of the written request to the relea of payment shall be within

            two weeks.

            STANDARD CONTRACT

            APPENDIXD-1 WORK SCOPE

            This appendix D-1(hereinafter referred to as work scope)is made on the day of 1

            June 2000

            1. General rules

            Fangzhuang store modification and reconstruction should be performed strictly in

            accordance with demand of owner, the drawing, technical specification, some

            concerned rules and the provisions stipulated in the contract, the work performed

            should meet the following national standardArchitectural Installment Quality

            Checking Evaluation Unified Standard(GBJ300-80)

            Except the equipment supplied by the Employer and the equipment installed and

            tested by the special contractor assigned by the Employer, all the work scope

            implement must be carried on according to concerned rules of testing, adjustment

            and operation.

            2. Work scope

            2.1 Construction modification (including main entrance and exit modification)

            2.2 Electric system modification (including fresh area lighting fitting)(the lamp

            supplied by party A)

            2.3 HVAC system modification (including fresh area system and new fan)

            2.4 W/S drainage system modification

            3. work out of scope

            3.1 weak electric system install;

            3.2 Fire-fighting system equipment and install;

            3.3 ElectricW/S drainage equipment install;

            3.4 Distribution room main switch;

            Appendix D-1

            校園的春天-北京天使露出

            STANDARD CONTRACT( 標準合同)

            本文發布于:2023-11-04 06:52:21,感謝您對本站的認可!

            本文鏈接:http://m.newhan.cn/zhishi/a/1699051941205773.html

            版權聲明:本站內容均來自互聯網,僅供演示用,請勿用于商業和其他非法用途。如果侵犯了您的權益請與我們聯系,我們將在24小時內刪除。

            本文word下載地址:STANDARD CONTRACT( 標準合同).doc

            本文 PDF 下載地址:STANDARD CONTRACT( 標準合同).pdf

            上一篇:合同名詞翻譯
            下一篇:返回列表
            標簽:contract
            留言與評論(共有 0 條評論)
               
            驗證碼:
            Copyright ?2019-2022 Comsenz Inc.Powered by ? 實用文體寫作網旗下知識大全大全欄目是一個全百科類寶庫! 優秀范文|法律文書|專利查詢|
            主站蜘蛛池模板: 久久大香国产成人av| 欧美 亚洲 日韩 在线综合| 国产精品hd在线播放| 粉嫩一区二区三区国产精品| 国产精品久久一区二区三区| 波多野结衣久久一区二区| 亚洲国产成人av国产自| 日本少妇被黑人猛cao| 无码免费大香伊蕉在人线国产| 亚洲av成人区国产精品| 国产精品高清中文字幕| 精品久久久久久中文字幕2017| 亚洲av高清一区二区| 永久免费在线观看蜜桃视频| 亚洲a人片在线观看网址| 国产综合色产在线精品| 99re热精品视频中文字幕不卡 | 好紧好爽免费午夜视频| 国产伦精品一区二区亚洲| 伊人久在线观看视频| 国产午夜在线观看视频播放| 天天做日日做天天添天天欢公交车 | 亚洲暴爽av天天爽日日碰| 无码综合天天久久综合网| 激,情四虎欧美视频图片| 极品蜜臀黄色在线观看| 日产精品99久久久久久| 东京热av无码电影一区二区| 亚洲欧美高清在线精品一区二区| 日韩精品一区二区三区四区视频| 免费吃奶摸下激烈视频| 国产欧美久久一区二区三区| 国产精品中文字幕第一页| 大地资源高清在线观看免费新浪| 一个色综合亚洲热色综合| 在线观看亚洲精品国产| 亚洲AV日韩AV一区二区三曲| 中文字幕亚洲制服在线看| 国产午夜福利精品片久久| 777奇米四色成人影视色区| 国产成人精品白浆免费视频试看 |